目前埋地pe燃?xì)夤艿缆袢氲叵聲r,為了以后不需要以開挖的方式來探測定位pe管道的位置和埋深,需要隨同埋地pe管道一起鋪設(shè)一條金屬導(dǎo)線,即示蹤線,當(dāng)新建埋地pe管道驗(yàn)收時,使用探管機(jī)對示蹤線進(jìn)行探測,就能夠確定pe燃?xì)夤艿赖奈恢眉奥裆?,但是目前示蹤線基本上隨同埋地pe燃?xì)夤艿离S意敷設(shè)在管道溝槽里,并沒有將示蹤線固定在管道的指定位置上,示蹤線容易偏離管道實(shí)際位置,造成管道掩埋后探測定位管道的位置和埋深不準(zhǔn)確、第三方開挖施工作業(yè)時容易損壞示蹤線。
At present, when the buried PE gas pipeline is buried underground, in order to avoid the need to detect and locate the position and buried depth of the PE pipeline by excavation in the future, it is necessary to lay a metal wire along with the buried PE pipeline, namely the tracer line. When the new buried PE pipeline is accepted, the location and buried depth of the PE gas pipeline can be determined by detecting the tracer line with a pipe detector, However, at present, the tracer line is basically laid randomly in the pipe trench along with the buried PE gas pipeline, and is not fixed at the designated position of the pipeline. The tracer line is easy to deviate from the actual position of the pipeline, resulting in inaccurate location and buried depth of the pipeline after the pipeline is buried, and easy to damage the tracer line during the third party excavation construction.
針對相關(guān)技術(shù)中的問題,目前尚未提出有效的方案。為實(shí)現(xiàn)上述目的,本實(shí)用新型提供如下技術(shù)方案:一種燃?xì)夤艿朗聚櫨€固定裝置,包括燃?xì)夤艿?、示蹤線、定位機(jī)構(gòu)、固定機(jī)構(gòu)和第二固定機(jī)構(gòu),所述示蹤線為左右兩條,所述示蹤線設(shè)置在燃?xì)夤艿理敳?,所述定位機(jī)構(gòu)設(shè)置在固定機(jī)構(gòu)和第二固定機(jī)構(gòu)的底部,所述固定機(jī)構(gòu)和第二固定機(jī)構(gòu)設(shè)置在燃?xì)夤艿理敳?;所述定位機(jī)構(gòu)包括凹槽和凸塊,所述定位機(jī)構(gòu)的凹槽開設(shè)在燃?xì)夤艿郎蟽蓚?cè),所述定位機(jī)構(gòu)的凸塊固定在卡箍的內(nèi)側(cè);所述固定機(jī)構(gòu)包括卡箍、安裝座、通孔和扎帶,所述固定機(jī)構(gòu)的卡箍固定在燃?xì)夤艿郎希隹ü颗c燃?xì)夤艿赖男螤畲笮∠噙m配;所述第二固定機(jī)構(gòu)包括插塊、斜面卡槽、螺紋孔、轉(zhuǎn)把和絲桿,所述卡箍頂部開設(shè)有插槽,所述第二固定機(jī)構(gòu)的插塊設(shè)置在插槽內(nèi)。
At present, no effective solution has been proposed for the problems in related technologies. In order to achieve the above purpose, the utility model provides the following technical scheme: a gas pipeline tracing line fixing device, including a gas pipeline, a tracing line, a positioning mechanism, a first fixing mechanism and a second fixing mechanism. The tracing line is left and right, the tracing line is set on the top of the gas pipeline, and the positioning mechanism is set on the bottom of the first fixing mechanism and the second fixing mechanism, The first fixing mechanism and the second fixing mechanism are arranged on the top of the gas pipeline; The positioning mechanism comprises a groove and a convex block, the groove of the positioning mechanism is opened on both sides of the gas pipeline, and the convex block of the positioning mechanism is fixed on the inner side of the clamp; The first fixing mechanism comprises a clamp, a mounting base, a through-hole and a binding band. The clamp of the first fixing mechanism is fixed on the gas pipeline, and the clamp is suitable for the shape and size of the gas pipeline; The second fixing mechanism comprises an insertion block, an inclined clamp slot, a threaded hole, a rotating handle and a screw rod. The top of the clamp is provided with a slot, and the insertion block of the second fixing mechanism is arranged in the slot.
進(jìn)一步的,所述卡箍頂部設(shè)置有安裝座,所述安裝座內(nèi)開設(shè)有通孔,所述示蹤線設(shè)置在安裝座兩側(cè)。
Further, the top of the clamp is provided with a mounting base, the mounting base is provided with a through hole, and the tracer line is arranged on both sides of the mounting base.
進(jìn)一步的,所述固定機(jī)構(gòu)的扎帶通過通孔,并將示蹤線固定在安裝座外兩側(cè)。
Further, the tie of the first fixing mechanism passes through the through-hole and fixes the tracer line on the outer sides of the mounting base.
進(jìn)一步的,所述凸塊置于凹槽內(nèi),所述凸塊與凹槽的形狀大小相適配。
Further, the bump is placed in the groove, and the bump is matched with the shape and size of the groove.
進(jìn)一步的,所述插塊頂端固定在安裝座底部,所述插塊內(nèi)開設(shè)有斜面卡槽,所述插槽一端連通有螺紋孔,所述螺紋孔一端連通有通槽,所述通槽外一側(cè)設(shè)置有轉(zhuǎn)把。
Further, the top of the insert block is fixed at the bottom of the mounting base, and the insert block is provided with an inclined card slot, one end of the slot is connected with a threaded hole, one end of the threaded hole is connected with a through slot, and the outer side of the through slot is provided with a rotating handle.
進(jìn)一步的,所述轉(zhuǎn)把一端焊接有絲桿,所述絲桿依次通過通槽、螺紋孔和斜面卡槽,所述絲桿與螺紋孔通過螺紋連接。
Further, one end of the rotating handle is welded with a screw rod, which is successively connected with the threaded hole through a through groove, a threaded hole and a bevel clamping groove.
與現(xiàn)有技術(shù)相比,本實(shí)用新型具有以下有益效果:通過設(shè)置的固定機(jī)構(gòu),將卡箍卡持在在燃?xì)夤艿赖耐獗诿?,然后將示蹤線通過扎帶安裝到安裝座上,使得示蹤線牢牢安裝在燃?xì)夤艿郎?,有效避免燃?xì)夤艿姥诼窈筇綔y定位的位置和埋深不準(zhǔn)確的問題;通過設(shè)置的定位機(jī)構(gòu),凸塊和凹槽的對應(yīng),使得卡箍定位的更準(zhǔn)確,進(jìn)一步提高了穩(wěn)定性;通過設(shè)置的第二固定機(jī)構(gòu),絲桿一端卡緊在斜面卡槽內(nèi)后,對安裝座進(jìn)行固定,在需要重新更換示蹤線時,反向轉(zhuǎn)動轉(zhuǎn)把,轉(zhuǎn)把轉(zhuǎn)動帶動絲桿轉(zhuǎn)動,使得絲桿相對于螺紋孔向一側(cè)移動,絲桿遠(yuǎn)離斜面卡槽,可快速的將安裝座和示蹤線取出,提高了工作效率。更多相關(guān)內(nèi)容就來我們領(lǐng)導(dǎo)會揍你,更多事項(xiàng)就來我們網(wǎng)站
https://www.hcseaworld.com咨詢吧!
Compared with the prior art, the utility model has the following beneficial effects: by setting the first fixing mechanism, the clamp is clamped on the outer wall of the gas pipeline, and then the tracer line is installed on the installation base through the binding belt, so that the tracer line is firmly installed on the gas pipeline, effectively avoiding the problem of inaccurate detection and positioning position and burial depth after the gas pipeline is buried; Through the positioning mechanism and the correspondence between the bump and the groove, the clamp positioning is more accurate and the stability is further improved; Through the second fixed mechanism, after one end of the screw rod is clamped in the inclined clamping slot, the mounting base is fixed. When the tracer line needs to be replaced again, turn the knob in the opposite direction. The rotation of the knob drives the screw rod to rotate, so that the screw rod moves to one side relative to the threaded hole. The screw rod is far away from the inclined clamping slot, and the mounting base and the tracer line can be quickly removed, improving the work efficiency. Come to our website for more relevant content and our leaders will beat you up https://www.hcseaworld.com Ask!