国产av麻豆一区麻豆二区|精品国产三级a∨在线欧美|欧美日韩国产综合不卡视频|在线 精品 国产 亚洲

歡迎來到濱州恒通電力器材有限公司網站,我們竭誠為您服務

公司新聞
當前位置:首頁-資訊中心>公司新聞燃氣管道警示帶溝槽開挖和回填土操作

燃氣管道警示帶溝槽開挖和回填土操作

來源:http://m.xqpxqpp.cn/ 發(fā)布時間:日期:2022-07-14 0
當開挖施工時,如挖到燃氣管道警示帶,則表示在下方0.30.5米處有燃氣管道,起到了警示和保護作用。那么您知道燃氣管道警示帶溝槽開挖和回填土操作是怎樣的嗎?
During excavation, if a gas warning tape is dug, it means that there is a gas pipeline 0.3 to 0.5 meters below, which plays a role of warning and protection. Do you know the operation of trench excavation and backfill of gas pipeline warning tape?
溝槽開挖
Trench excavation
(1)混凝土路面和瀝青路面的開挖應使用切割機切割。
(1) The excavation of concrete pavement and asphalt pavement shall be cut by cutting machine.
(2)管道溝槽應按設計規(guī)定的平面位置和標高開挖。當采用人工開挖且無地下水時,槽底預留值應為0.05~0.10m;管道安裝前應人工清底設計標高。
(2) The pipeline trench shall be excavated according to the plane position and elevation specified in the design. When manual excavation is adopted and there is no groundwater, the reserved value at the bottom of the groove should be 0.05~0.10m; The bottom of the pipeline shall be manually cleaned to the design elevation before installation.
(3)管溝溝底寬度和工作尺寸,應根據現(xiàn)場實際情況和管道敷設方法確定。
(3) The width and working size of the trench bottom shall be determined according to the actual situation on site and the pipeline laying method.
(4)局部超挖部分應回填夯實。當溝底無地下水時,超挖在0.15m以內,可采用原土回填;超挖在0.15,以上,可采用石灰土處理。當溝底有地下水或水量較大時,應采用級配砂石或天然砂回填標高。超挖部分回填后壓實,其密實度應接近原地基天然土的密實度。
(4) The partially over excavated part shall be backfilled and compacted. When there is no groundwater at the bottom of the ditch, the over excavation is within 0.15m, and the original soil can be used for backfilling; If the overbreak is more than 0.15, lime soil can be used for treatment. When there is groundwater at the bottom of the ditch or the water volume is large, graded sand or natural sand should be used to backfill to the elevation. The over excavated part shall be backfilled and compacted, and its compactness shall be close to that of the natural soil of the original foundation.
管道警示帶
(5)在濕陷性黃土地區(qū),不宜在雨期施工,或在施工時切實排除溝內積水,開挖時應在溝底預留值0.03~0.06m厚的土層進行壓實處理。
(5) In the collapsible loess area, it is not suitable to construct in the rainy season, or effectively remove the ponding in the ditch during construction. During excavation, a soil layer with a thickness of 0.03~0.06m should be reserved at the bottom of the ditch for compaction.
(6)溝底遇有廢棄構筑物、硬石、木頭、垃圾等雜物時必須,并應鋪一層厚度不小于0.15m砂土或素土,整平壓實及設計標高。
(6) Waste structures, hard stones, wood, garbage and other debris at the bottom of the ditch must be removed, and a layer of sandy soil or plain soil with a thickness of not less than 0.15m shall be paved, leveled, compacted and designed elevation.
(7)對軟土基及特殊腐蝕土壤,應按設計要求處理。
(7) Soft soil foundation and special corrosive soil shall be treated according to the design requirements.
回填土
back fill
(1)不得采用凍土、垃圾、木材及軟性物質回填。管道兩側及管頂以上0.5m內的回填土,不得含有碎石、磚塊等雜物,且不得采用灰土回填。距管頂0.5m以上的回填土中的石塊不得多于10%、直徑不得大于0.1m,且均勻分布。
(1) Frozen soil, garbage, wood and soft materials shall not be used for backfilling. The backfill on both sides of the pipeline and within 0.5m above the pipe top shall not contain debris, bricks and other debris, and shall not be backfilled with lime soil. The stones in the backfill soil above 0.5m from the pipe top shall not be more than 10%, and the diameter shall not be more than 0.1M, and shall be evenly distributed.
(2)溝槽的支撐應在管道兩側及管頂以上0.5m回填完畢并壓實后,在保證的情況下進行拆除,并應采取細砂填實縫隙。
(2) The support of the trench shall be backfilled and compacted on both sides of the pipe and 0.5m above the pipe top, and then removed under the condition of ensuring safety, and the gap shall be filled with fine sand.
(3.)溝槽回填時,應先回填管底懸空部位,再回填管道兩側。
(3) when backfilling the trench, the suspended part at the bottom of the pipe shall be backfilled first, and then both sides of the pipe shall be backfilled.
(4)回填土應分層壓實,每層虛鋪厚度宜為0.2~0.3m,管道兩側及管頂以上0.5m內的回填土必須采用人工壓實,管頂0.5m以上的回填土可采用小型機械壓實,每層虛鋪厚度宜為0.25~0.4m。
(4) The backfill soil shall be compacted in layers, and the virtual paving thickness of each layer should be 0.2~0.3m. The backfill soil on both sides of the pipeline and within 0.5m above the pipe top must be compacted manually. The backfill soil above 0.5m above the pipe top can be compacted by small machinery, and the virtual paving thickness of each layer should be 0.25~0.4m.
(5)回填土壓實后,應分層檢查密實度,并做好回填記錄。
(5) After the backfill is compacted, the compactness shall be checked layer by layer, and the backfill records shall be made.
以上就是今天為大家介紹的關于問題以及注意事項的全部內容,希望對大家能有所幫助,想要了解更多內容可以電話聯(lián)系我們或者關注我們的網站http://m.xqpxqpp.cn,我們的工作人員會及時與您取得聯(lián)系。
The above is all about the problems and precautions introduced to you today. I hope it can help you. If you want to know more, you can contact us by phone or follow our website http://m.xqpxqpp.cn , our staff will contact you in time.

相關產品 / Related products

  • 地釘

    地釘

  • 地釘

    地釘

  • 警示樁

    警示樁

  • 警示樁

    警示樁

截屏,微信識別二維碼